UL 508A Frequently Asked Questions
Q. How does NEC 409 apply when modifying an existing UL labeled panel that does not meet the requirements of 409? Particularly when our modification does not relate to the non-compliance issues.
A. Technically modifying a Listed panel voids the Listing. In addition, if an inspection by the local authority is conducted, NEC Article 409 could be enforced.
Category: Code
Keywords: NEC 409