UL 508A Frequently Asked Questions
Q. So do existing panel installations included. If not does a rewire or mod trigger compliance?
A. The short answer is No. However, if the panel is modified, moved and/or updated and an inspection by the local authority is conducted then the requiresments of Article 409 could be enforced.
Category: Code
Keywords: existing panels, rewire, rewiring, modification